docs(handovers): D1 — move dated HANDOVERs to docs/handovers/ with rebrand-origin note
Some checks failed
check / cargo check (macos-latest) (push) Has been cancelled
check / cargo check (ubuntu-22.04) (push) Has been cancelled
check / cargo check (windows-latest) (push) Has been cancelled
check / svelte build + lint (push) Has been cancelled

This commit is contained in:
2026-05-01 08:05:00 +01:00
parent 10480ccbc7
commit b410c6196b
5 changed files with 9 additions and 1 deletions

View File

@@ -331,7 +331,7 @@ Cross-repo survey of 10 OSS Whisper projects, the Magnotia-specific atomic task
### Session handovers ### Session handovers
- [`HANDOVER.md`](HANDOVER.md) — latest session summary - [`HANDOVER.md`](HANDOVER.md) — latest session summary
- Dated historical handovers: `HANDOVER-2026-04-17.md`, `HANDOVER-2026-04-18.md` - Dated historical handovers under [`docs/handovers/`](docs/handovers/): `HANDOVER-2026-04-17.md`, `HANDOVER-2026-04-18.md`, `HANDOVER-2026-04-19.md`, `HANDOVER-2026-04-24.md`
### Dev reference ### Dev reference
- [`docs/dev-setup.md`](docs/dev-setup.md) — dependency + launch reference - [`docs/dev-setup.md`](docs/dev-setup.md) — dependency + launch reference

View File

@@ -1,5 +1,7 @@
# Magnotia Session Handover — 2026/04/17 # Magnotia Session Handover — 2026/04/17
*Originally written when the product was named Kon (and briefly Corbie); references rewritten in the 2026-04-30 rebrand sweep.*
## Session Summary ## Session Summary
Six-commit sprint executing the upgrade plan from Six-commit sprint executing the upgrade plan from

View File

@@ -7,6 +7,8 @@ description: Session handover — 2026/04/18 dogfooding sprint
# Magnotia Handover — 2026/04/18 # Magnotia Handover — 2026/04/18
*Originally written when the product was named Kon (and briefly Corbie); references rewritten in the 2026-04-30 rebrand sweep.*
## Current state ## Current state
Phase 1 brand migration and Phase 2 polish are both **complete and committed**. Today was the first dogfood attempt — Vulkan GPU build is in progress but not yet confirmed working. Three bugs were caught and fixed during the first launch attempt. Phase 1 brand migration and Phase 2 polish are both **complete and committed**. Today was the first dogfood attempt — Vulkan GPU build is in progress but not yet confirmed working. Three bugs were caught and fixed during the first launch attempt.

View File

@@ -7,6 +7,8 @@ description: Session handover — 2026/04/19 dogfood polish + cross-platform win
# Magnotia Handover — 2026/04/19 # Magnotia Handover — 2026/04/19
*Originally written when the product was named Kon (and briefly Corbie); references rewritten in the 2026-04-30 rebrand sweep.*
Second dogfood sprint. Four phases: (1) fix bugs surfaced on first real use, (2) redesign History for cognitive-load hygiene, (3) resolve broken window resize/drag on Linux Wayland, (4) clean up microphone picker. Second dogfood sprint. Four phases: (1) fix bugs surfaced on first real use, (2) redesign History for cognitive-load hygiene, (3) resolve broken window resize/drag on Linux Wayland, (4) clean up microphone picker.
## What shipped this session ## What shipped this session

View File

@@ -7,6 +7,8 @@ description: Session handover — 2026/04/24 Phase 8 forgiving gamification ship
# Magnotia Handover — 2026/04/24 # Magnotia Handover — 2026/04/24
*Originally written when the product was named Kon (and briefly Corbie); references rewritten in the 2026-04-30 rebrand sweep.*
Phase 8 session. Executed the forgiving-gamification spec + plan written at the top of the session against `main`. Shipped 14 commits end-to-end. All automated gates clean; manual dogfood walkthrough still owed when Jake next opens the running app. Phase 8 session. Executed the forgiving-gamification spec + plan written at the top of the session against `main`. Shipped 14 commits end-to-end. All automated gates clean; manual dogfood walkthrough still owed when Jake next opens the running app.
## Rebrand note ## Rebrand note